30.99kw School Solar Panel Installation Leeds-Moor Allerton Hall Primary School

Moor Allerton Hall Primary School Solar Installation, Leeds

30.99kw School Solar Panel Installation Leeds2-Moor Allerton Hall Primary School

Additional roof utilised

Custom Solar‘s Andy Stone (Customer Services Manager) may not have had much joy from supporting Leeds United over the years but this Solar PV system in Leeds managed to turn his frown upside down!  The school has two separate electricity meters, so two separate systems over three roofs were installed on the buildings relating to each meter and connection point. In this case it also allowed 2 separate feed-in tariffs to be claimed at a higher rate than would have been possible on a single connection.  Using the latest technology our design engineers ensured any possible shading issues due to the trees on site did not affect the system. The funder’s requested we utilise stock ends on this project as the separate systems allowed for two panel choices.  This also meant their budget was maximised carefully allowing even more schools to sign up to the free funding without compromising system quality.

 

System Size: 30.99kwp
Panel Manufacturer: 98 x Trina Solar TSM-255-PC05 24 x Sharp ND-R250A5
Inverter Manufacturer: 2 x SMA STP 10000TL-10 1 x SMA Sunny Boy 5000TL
Estimated System Annual Performance: 27147 kilowatt hours
CO2 Savings per annum: 14360 Kg
Duration of installation: 1 week
Completion date: 12/09/2013
Fully funded as part of the Solar 4 schools project