MSE Hiller

About the client

MSE Hiller is a leading name in the supply and rental of centrifuges and sludge dewatering equipment, working with the leading names in Industry to install state of the art centrifuge technology.

Drivers for the project

Working with some of the Country’s largest and most prestigious food producers, MSE Hiller were keen to improve on their already impressive green credentials by turning to solar power to operate their head office and factory as close to carbon neutral as possible.

 

 

Challenges

The site based on junction 29 of the M1 has a dual pitched roof at different levels, this was designed with architectural beauty in mind and although a striking building provided some access challenges. In addition to this, the highest point of the roof is located close to an overhead power line that runs adjacent to the M1 itself.

Solution

Custom Solar assessed both land and roof systems for solar but uncovered a small planning issue with the neighbouring land, this led to the installation of a 75kw roof-mounted system on top of the factory and head office roof that feeds directly into the existing electrical system to power cranes and CNC machines. A bespoke harness system was also installed to overcome the access and safety requirements of such an interesting site.

Results

The solar PV system at MSE Hiller has reduced the monthly expenditure on electricity but During summer months sees the site go ‘off grid’ and export remaining power back to the local grid.

Testimonial

Ivan Fomin, MSE Managing Director said:

“Just wanted to write and thank you for a positive experience in choosing and installing the solar PV system.

I appreciate that you were very patient with us in the development and proposal stages of the project, allowing us to explore funding and alternative suppliers. Once we had decided to go ahead with Custom Solar the process went very smoothly and professionally including the liaison with our site staff, development of risk assessments and safe working method statements particular to our site.

Once on site, your staff were well presented and cooperated with our personnel to ensure that the installation period caused minimal disruption to our work activities.

The system is up and running and even the FIT registration process has been straightforward with your assistance.

I am extremely pleased to have selected to work with Custom Solar and hope it becomes a good reference.”

 

Project details

  • Location: DERBYSHIRE
  • System Size: 75KWP
  • Panel Manufacturer: CANADIAN SOLAR
  • Number of Panels: 300
  • Inverter Manufacturer: FRONIUS
  • Estimated System Annual Performance: 66,181 KW/H
  • CO2 Savings per annum: 35,075 KG
  • Completion date: 12/12/2014